Avaya BCM 4.0 Networking Guide de configuration Page 199

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 758
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 198
199
BCM 4.0 Networking Configuration Guide
Chapter 15
Configuring lines: T1-Digital Ground Start
The following describes how to configure T1-Digital Ground Start lines.
The following paths indicate where to access the Ground Start lines through Element Manager and
through Telset Administration:
Element Manager: Configuration > Telephony > Lines
Telset interface: **CONFIG > Lines
Prerequisites
Complete the following prerequisites checklist before configuring the modules.
Process map
Figure 66 and Figure 67 provide an overview of the line features for Ground Start lines.
Task: Configure ground start lines connected to the system
“Configuring digital ground start line features” on page 202
DTM module is installed and configured. Refer to “Trunk Module Parameters” on
page 124.
Lines are provisioned. Refer to “Provisioning module lines/loops” on page 132.
Vue de la page 198
1 2 ... 194 195 196 197 198 199 200 201 202 203 204 ... 757 758

Commentaires sur ces manuels

Pas de commentaire