Avaya Synchronous Net Modules in an ASN Platform Manuel d'utilisateur Page 52

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 72
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 51
Installing Synchronous Net Modules in an ASN Platform
Cabling Requirements for the Net Modules18 BNX Software Version <x.x> Test Part Number
X.21 Compliance
X.21 compliance for the net modules is as follows:
The Dual Sync net module requires a 44-pin D-Sub to X.21 cable, Order No.
7224 (Table A-11 and Figure A-9).
The Quad Sync net module requires a 50-pin to X.21 cable, Order No. 7936
(Table A-12 and Figure A-10).
Table A-11. Pin-to-Pin Connections for the 44-Pin D-Sub to X.21 Cable
(Order No. 7224)
Bay Networks Termination Remote Termination
Signal Pin to Pin Signal
Send Data+ 2 2 Transmitted Data A
Send Data- 16 9 Transmitted Data B
Request to Send+ 4 3 Control A
Request to Send- 18 10 Control B
Receive Data+ 3 4 Receive Data A
Receive Data- 17 11 Receive Data B
Data Carrier Detect+ 9 5 Indication A
Data Carrier Detect- 23 12 Indication B
Send Timing+ 10 6 Timing A
Send Timing- 24 13 Timing B
Signal Ground 7 8 Signal Ground
Frame Ground 1 1 Frame Ground
Internal Wire Connections
Pin 14
> 15
Pin 28
> 30
Pin 41
> 43
Vue de la page 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 71 72

Commentaires sur ces manuels

Pas de commentaire