Avaya Redundancy BCM Rls 6.0 Manuel d'utilisateur Page 7

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 33
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 6
Redundancy
NN40011-048 Issue 1.2 BCM450 Rls 6.0 7
Flowchart
This flowchart depicts the steps necessary to upgrade a BCM 450 with a
redundancy kit and RAID kit.
Prepare the BCM 450 for upgrade: Refer to the Preparing the BCM
450 for Redundancy Kit Installation section of this guide
Check that you have the required components to install: Refer to the
Installing the Redundancy & RAID Kit section of this guide
Install a Secondary Fan and Faceplate: Refer to the Installing the
Secondary Fan and Faceplate section of this guide
Check that the RAID service is enabled: Refer to the Enabling the
RAID Service after Upgrade section of this guide
Install a Secondary Hard Disk Drive: Refer to the Installing the
Secondary Hard Disk Drive section of this guide
Check that you meet the Requirements for upgrading the BCM with a
Redundancy or RAID Kit: Refer to the Overview section of this guide
Vue de la page 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 32 33

Commentaires sur ces manuels

Pas de commentaire